MineMuse

MineMuse

Created using Figma
The expanding growth of cryptocurrencies today has led to a vivid expansion in the energy consumption for mining and mining activities in countries with lesser social and environmental standards - where electricity is broadly produced using fossil fuels. The worst part stays, that the earlier decision of making process in these networks is getting altered because of the concentration of mining power in the hands of a couple of big corporations and the changes in protocols, hard forks are in danger of being hampered by the economic interests of a few.
PUBLIC SALE
2019年10月27日
2019年11月27日
100% 完成
募集资金 - 无数据
past
PRE SALE
2019年9月25日
2019年10月24日
100% 完成
募集资金 - 无数据
past
令牌详细信息
断续器
MNM
接受的货币
ETH
公司详情
注册国家
United States
额外细节
分类
平台

关于 MineMuse

To be able to run a profitable mining business a very specialized, high-power machinery and cutting- edge technology is required. We at MineMuse our mining equipments directly from manufactures at heavily-discounted rates which reduces the overall cost of mining.

Also we have a group of well established resources who have been mining since long back and have great knowledge and potential to do the mining.

The temperature of these stations is on a high side because of the excessive amount of heat produced by these mining equipments, so to reduce the head and bring down the temperature, our mining stations are designed in such a way that there is a proper arrangement for ventilation and less electric power is consumed for this purpose.

特征

Miners with underpowered setups and less infrastructure end up spending more than the income generated. Reasons being; expensive hardware, costly electric power, maintenance and security along with issues such as hardware and electric failure, network disruptions, price variation among others.

To make mining truly accessible, profitable and Hassel free for everyone and being more cost effective, we at MineMuse have come up with solution. We are manufacturing our own ASIC for future use. We will be creating our own electric power using the natural resources available, which will reduce our costing for mining; also with its use we will be able to mine more quantity in less timeframe. Manufacturing our own ASIC will result in less expenditure for the hardware's to be used. We are also planning to sell further our own manufactured ASICs to other mining corporations, which will help us in growing along with the profits.

%name%Roadmap

  • Q1 2018

  • R&D and current structure analyses.
  • Q2 2018

  • Product Conceptualization.
  • Q3 2018

  • Financial assessment.
  • Q3 2018

  • Acquisition of Team and Resources.
  • 阅读更多
  • Q4 2018

  • Company formed.
  • Q4 2018

  • Development commenced.White Paper release.
  • Q1 2019

  • Distribution network establishment.
  • Q1 2019

  • Over 5000 ASIC/Gpu's installed.
  • Q2 2019

  • Partnership with global solar manufacturers.
  • May 5-July 5, 2019

  • Private sale and seed funding (raised 3million).
  • September - October 2019

  • Pre sale. Public sale
  • Q4 2019

  • Starts adding 7000-10000 MNM ASIC's.
  • Q1 2020

  • Opening of first wind turbines to powering farms.
  • Q2 2020

  • R&D completed on Fossil fuel resources.
  • Q3 2020

  • First farm opened on Fossil fuel resources.
  • Q3 2020

  • Audit report released.
  • Q4 2020

  • whitepaper version 1.0.1 released.

MineMuse 球队

验证 0%

注意。未经证实的成员实际上可能不是团队成员

Brian Sheldon Hess
Chairperson/Director
未验证
Alan Mood
CEO & Founder
未验证
Donald M. Griffith
Chief Financial Officer
未验证
Abdelkhalek Matla
Director Technology
未验证
Milada Malinova
CIO
未验证
Shaiming Hsiao
Business Analyst
未验证
Dana Stehlikova
System Administrator
未验证
Lauren Reed
Chief Data Officer
未验证
Robert Krueger
H.R. manager
未验证
Thorsten Fruehauf
Senior Software Engineer
未验证
Imelda Smids
Chief Compliance Officer
未验证
Matias Bobeldijk
System Analyst
未验证

MineMuse 最新消息

  • 由于信息更新可能存在时间差异,因此应通过其官方网站或其他沟通渠道验证有关每个ICO项目的准确信息。
  • 这些信息不是投资ICO资金的建议或建议。请自行彻底调查相关信息并决定ICO的参与情况。
  • 如果您认为有任何问题需要纠正,或者您想提交自己的ICO项目,请给我们发送电子邮件。
请阅读免责声明和风险警告。 显示免责声明和风险警告。